Construction Digest

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Morris Hospital Expansion and Renovation Creates More Treatment Space, Updated and Relocated Emergency Services

MORRIS, IL — Phase One of a multi-phase expansion and renovation of Morris Hospital in Morris, Illinois, is complete, offering visitors and patients an improved front door and treatment experience. Led by DesignGroup, the project includes a lobby renovation, a new Emergency Department, and the creation of an infusion department.

“In 2015, DesignGroup worked with the outstanding team at Morris Hospital to conduct a Facilities Master Plan for renovations,” said DesignGroup’s CEO, Sherm Moreland, AIA, ACHA, LEED AP BD+C. “The result was a plan that looks holistically at the entire hospital and considers thoughtfully how to make renovations that continue Morris’ tradition of excellent patient care, while updating the facilities to serve more people quickly and comfortably.”

Phase One included the relocation of the Emergency Department and other services to streamline wayfinding for visitors by creating one front door. The main reception desk and registration kiosks are now positioned to be adjacent to the front door. The curve of the main concourse leads through the front of the hospital with the new Emergency Department and Infusion Therapy Center on either end. The path leads patients and visitors to Registration, Surgery Waiting, Obstetrics, and Lab/Blood Draw.

The Emergency Department was made possible by the relocation of the administrative wing to allow for more clinical space on the first floor. It features a rapid care area for quick treatment of low acuity patients. The number of treatment stations increased from 11 to 17, and now include one trauma room, one treatment room, two rapid care stations, 10 exam rooms, a results waiting area, a Sexual Assault Nurses Exam room, and two safe rooms for holding behavioral health patients.

In addition to the lobby renovation and new Emergency Department, Phase One involved creating an infusion department. It features four private bays and one private room, all of which include windows to allow outdoor views and natural light for patients and staff.

Case  - CE
Your local Case Construction Equipment Inc dealer
Birkey's Construction Equipment

Future phases for this project involve an enhanced entry to the hospital, a serenity garden, renovations to cardio-diagnostics, and additional patient services. The project is slated for completion in 2021.

Takeuchi Mfg Ltd
Your local Takeuchi Mfg Ltd dealer
Brandeis Machinery
Takeuchi Mfg Ltd
Your local Takeuchi Mfg Ltd dealer
Brandeis Machinery
SITECH
Your local Trimble Construction Division dealer
SITECH Indiana
SITECH Mid-South
SITECH Ohio